Epoxy Coatings

Dupage airport

Priming and applying epoxy coating to steel at DuPage Airport Hanger
Priming and applying epoxy coating to steel at DuPage Airport Hanger

Epoxy floor prep (step 1)

Epoxy floor prep.
Epoxy floor prep.
Epoxy floor prep.
Epoxy floor prep.
Epoxy floor prep.
Epoxy floor prep.

Epoxy floor prep (step 2) - quartz broadcast system showing epoxy cove base

Epoxy floor prep for quartz broadcast system showing epoxy cove base.  Prep includes grinding of the floors followed by application of Epoxy cove base.
Epoxy floor prep for quartz broadcast system showing epoxy cove base.  Prep includes grinding of the floors followed by application of Epoxy cove base.
Epoxy floor prep for quartz broadcast system showing epoxy cove base.  Prep includes grinding of the floors followed by application of Epoxy cove base.

Epoxy floor prep (step 3) - broadcast coats for quartz flooring

1st and 2nd broadcast coats for Quartz Epoxy Flooring.  Applied after cove base.
1st and 2nd broadcast coats for Quartz Epoxy Flooring.  Applied after cove base.
1st and 2nd broadcast coats for Quartz Epoxy Flooring.  Applied after cove base.

Epoxy floor prep (step 4, final) - top coat

Urethane top coat applied over 1st and 2nd broadcast.  Urethane top coat applied to floor and cove base.
Urethane top coat applied over 1st and 2nd broadcast.  Urethane top coat applied to floor and cove base.
Urethane top coat applied over 1st and 2nd broadcast.  Urethane top coat applied to floor and cove base.

Two-tone Epoxy Flooring

Two-tone Epoxy Flooring
Two-tone Epoxy Flooring